nCircle
Talk Nano to us
Menu

Which views count?

A verified post has one closing count. See how the report handles repeat links, a missing reading and views above the brand’s billing cap.

Follow the accepted cut to its post.

The creator publishes the Reel with the competing label cropped out. The reviewer can open the live link next to the approved cut and check that the right version went up. That Reel now has its own line in the report.

Keep a record for each post.

Match the published link to the approved account, campaign and deliverable. Retain the platform’s post identifier so a short link and a full link to the same Reel count once. If the creator also uploads the video to TikTok, that upload has its own identifier and counter.

Keep the publication time and verification time separate. nCircle’s measurement schedule starts at verification. Record the metric, its source, when it was read and whether it refers to organic views, paid distribution or a combined counter. Only compare readings that use the same definition.

Read the checkpoints in order.

The example schedule checks the Reel’s counter every 48 hours for 14 days after verification. A count is available for six of the seven scheduled checks.

Day after verificationViewsRecord
22,480First scheduled reading
45,120Cumulative counter
6UnavailableNo reading captured
89,760New observed counter
1011,400Cumulative counter
1212,060Cumulative counter
1412,460Final scheduled reading

The day-eight reading already includes earlier views. Adding up the rows would count viewers’ activity several times. A later reading can show where the post ended but cannot tell us exactly what the counter said on day six.

Keep the report and agreed terms together.

The report keeps observed views separate from the billable quantity. The signed campaign agreement defines eligible posts, the measurement window, the cap and the agreed billing basis.

Reconcile a creator’s accepted offer separately. The brand agreement does not determine the creator’s compensation.

What if the counter disappears?

Mark the observation unavailable and keep the last accepted reading with its timestamp. If the final count is missing, the parties need their agreed evidence and shortfall terms to settle the line. Entering zero would imply the platform actually reported zero views.

A correction should identify the affected post, the evidence accepted, the prior figure and the difference. The revised report can then explain why the campaign total changed without treating the same post as new delivery.